![]() |
Division / Unit | : | Corridor Infrastructure and Social Impact Division |
Address | : | Chief Minister of Malacca, Level 1, Block Shahbandar, Seri Negeri, Hang Tuah Jaya, 75450 Ayer Keroh, Melaka |
|
Name | : | Puan Irmayanti Binti Hj. Ibrahim | |
Position | : | Pengarah | |
Tel | : | +606-333 3333 samb. 7214 | |
Faks | : | +606- 232 4915 | |
E-mel | : | irmayanty[at]melaka[dot]gov[dot]my |
Vision
-
Malacca became a state winner in a coordinate system utility infrastructure corridor a more planned and organized more systematically.
Mision
- Make the state of Malacca as a possessed sebuab corridor system for utility infrastructure a more organized, efficient and systematic.
Objective
- Plan, supervise, monitor, implement the development, enforcement, maintenance, and control of utility and infrastructure development.
- Devise and implement policies and programs for utility infrastructure.
- Coordinate and review all the utilities that have been conducted and existing public and private sector.
- Ensure that no road digging happening in the future.
- Collect database contains the latest information of all utility locations in Malacca.
- Provide excellent service & quality to ensure the development of utility infrastructure corridor is more organized.
- Planning, designing, coordinating with all the technical departments.
Client Charter
(i) |
Mengeluarkan kelulusan pelan cadangan utiliti dalam tempoh 14 hari bekerja daripada tarikh permohonan diterima. |
(ii) |
Memberikan ulasan terhadap pelan cadangan utiliti dalam tempoh 14 hari bekerja daripada tarikh permohonan diterima. |
(iii) |
Mengeluarkan laporan pemantauan jalan secara mingguan. |